spinning

My Fall 2017 Making List

If you missed the concept and explanation of my Making List, you can check out my first post for more details. Essentially, it's a way for me to focus my energies on the projects that are most important to me and feel less scattered/overwhelmed about my making.

The following items from my original Making List have been completed or cast on:

  1. Saturday Matinee Socks - finished
  2. Rainbow Leyburn Socks - finished, but as a different pair of socks that I started!
  3. Lopi Pullover - cast on
  4. Fen Dress - finished
  5. Watson Bra - finished
  6. Wiksten Tank 2 - failed, but attempted before throwing in the towel!

I also practiced my spinning with some fiber from my stash.

Since my priorities are shifting with the seasonal change, along with my current break from design work, I've updated my Making List to reflect my focus for fall. 

WIPS

  1. Lopi Pullover
  2. Fibre Co Stripey Raglan - this is a carryover WIP from the first list
  3. Charlemont Thermal - another carryover
Stripey Raglan vs Lopi Pullover

Stripey Raglan vs Lopi Pullover

I am hibernating my Miss Babs Cardigan design WIP for now, since it's not grabbing my attention. But it's there when I want it!

CAST ON

  1. Bonnie Banks Shawl for my mom, in Blue Moon BFL Sport
  2. Speckled Space Socks, using one of my stash sock yarns
  3. Impromptu - but only after finishing at least one garment from the WIP list!
Untitled design (10).png

SPIN

  1. White British Wool - I destashed the yarn I was planning on using for the Brookdale Vest, which was originally in my last CO list. I'm hoping to spin this into a Brookdale-suitable yarn!
  2. Spun Right Round Merino
  3. Malabrigo Nube

SEW

  1. 2nd Watson Bra
  2. Flannel shirt for Mark
  3. Serger projects, if I can get over my fears and teach myself how to use my serger!

In addition to my original Making List 'rules', I have added these two for fall:

  1. Cast on for new items after finishing the previous object in that category. IE, finish a garment before casting on a new one; finish a portable accessory before casting on a new one. Same principle for starting spinning and sewing projects. 
  2. Use stash for everything possible. In this case, I had to purchase a second skein of BFL Sport for my mom's shawl (to go with one from my stash), and I'll need to buy fabric for Mark's flannel shirt. But everything else I have stashed!

 

A Bevy of FOs

Here's a quick round-up of all my recent finished projects!

DSC_0605.jpg

In August I made my first ever bra, a Watson Bra using a kit from Tailor Made Shop. I'm counting this as a Summer of Basics FO, and it's also an item ticked off my Making List--yahoo! I was intimidated by bra making but it turned out to be surprisingly easy, and my only gripe was struggling with my machine eating the small seam allowances whenever I started a new seam. I did a straight 32C with no alterations, except for the straps. They're supposed to be attached to the top of the cups with rings, but that would put the adjustable buckle on top of my traps and I prefer having the hardware on the back of my body. Next time I might experiment with taking a small amount of fabric out of the band, as it fits comfortably on the middle set of hooks but I prefer starting a new bra on the outermost set of hooks so I can wear it longer before it gets stretched out.

DSC_0585.jpg

I finished my languishing pair of handdyed socks, also a Making List item! (I'm feeling very accomplished, dontcha know.) These are nothing crazy special, just colorful, vanilla shortie socks that will always be welcome in my wardrobe.

DSC_0628sm.jpg

And last weekend, I jumped back into spinning after a long hiatus (almost a year!) To practice, I pulled this braid of Frabjous Fibers Merino Top in Scarecrow and I was pleased to discover my muscle memory hadn't faded. Yesterday I did another spin and will share photos once that yarn is dry. I have several spinning projects on my Making List, and I'd like to use up 90% of my fiber supply before I allow myself to purchase any new fiber.

I recently finished up all my design obligations, meaning I'm not contracted for any pieces and I'm not working on any self-published designs at the moment either. I'm really looking forward to taking this time to work on my Making List, sink my teeth into some longer-term sewing or spinning projects, and enjoy some selfish making time before I return to designing. Happy fall to me!

My Making List

I recently discovered The Craft Sessions and fell down the rabbit hole of her Stash Less blog post series. Ever since I stopped working at Webs, my yarn consumerism has been way down and even before I left there, I was starting to be more mindful about my stash. I've done several purges of yarn, leaving me with a full yarn cabinet (rather than an overflowing one!) of prized skeins that I'd like to work though over the next few years. Coupled with my new budget, my eye is on using what I have and working on projects I've been pondering for awhile rather than heading off into new directions.

Thus, I decided to follow her challenge of creating a Making List. I'm leaving myself free to remove items from this list if I decide it no longer appeals to me, but if I want to add new things to the making list, I need to have completed something or removed something in its place. Note that this isn't my dreaming, wishful thinking list, but rather projects that I am committed to making because I already own the materials and in the case of some, they're already in progress. Designs for self-publishing are included, but contracted third-party obligations are not.

WIPS

  1. Miss Babs cardigan (design in progress)
  2. Fibre Co Stripey Raglan
  3. Saturday Matinee Socks--a finished FO as of Sunday night! Currently blocking.
  4.  Rainbow Leyburn Socks
  5. Charlemont Thermal

The cardigan will be set aside shortly as I have a sweater design I need to start working on. #2 just needs sleeves! Items 3 through 5 are long-standing WIPs, and I'm excited to close those projects out. I am definitely going to finish the Leyburn Socks, but I might change my mind on the thermal and rip it instead--need to dig that one out and take a long, hard look at it!

CAST ON

  1. Brookdale Vest
  2. Lopi Pullover
  3. Anzula Ava Set (design idea)

I have the yarn for all three of these, and the patterns for 1 & 2 to boot!

SPIN

  1. Romney fleece
  2. White British wool
  3. Spun Right Round fiber
  4. Malabrigo Nube.

Spinning is the most long-term of the categories, and I do need to get back into my spinning groove with some practice before tackling these fibers, especially the fleece. I'll likely do some practice spins with stash fiber I have expressly set aside for that purpose. In all honest, I'm not anticipating getting to spinning until the fall, or at least until I finish my current sewing list as that is more important to me.

SEW

  1. Fen Dress
  2. Watson Bra
  3. Wiksten Tank 2
  4. Serger projects

'Serger projects' in this case refers to the stash of knit fabric I have and any possible projects I want to do with it. I've been thinking of some jogger-style pants, pajama shorts for lounging around the house, and a casual tee or two. But first I need to learn how to use my serger!

Here are my tentative rules for the near future:

  1. Projects in the Making List take priority over random flights of fancy. (Exceptions: Any design obligations, duh.)
  2. $50/month budget for craft supplies. For now, I see that going to patterns and notions rather than yarn or fabric since I have a good stash to work from. I can roll any unspent $ over from month-to-month if I want to save up for something bigger than $50.
  3. If I'm avoiding a Making List project or not enjoying it--frog mercilessly, give away to a friend to finish, whatever, but no wasting time on things I don't love.

It may seem weird to put this much effort and structure into my hobbies, but I feel SO MUCH better for having done this. Getting my ideas out of my head and onto paper has cleared up brain space and made me decide what is actually a priority to me. I love having a good plan and I'm excited to get more crafting done the rest of this year! If you made a Making List, what would be on yours?

Tour de Fleece Results

In the end, I spun ONE skein during last month's Tour de Fleece. Technically I only spun the singles during the tour and plied it afterwards. (So much for those goals, eh?) But...what a beauty it is! gynxtrio

  • Company: Gynx Yarns
  • Fiber: Falkland
  • Colorway: Test Subject #1, a OOAK colorway
  • Put Up: 4 oz, approx. 470 yards
  • Spinning Method: Worsted, backwards short draw, 2-ply
  • Wheel: Lendrum DT

This is my first real 'thin yarn' and my first 'useable' skein of handspun--as in, the yardage and size of the yarn is versatile and I see myself knitting this before any of my previous handspun. I'm so excited to dive into my fiber stash and pick out my next spinning project!

Tour de Fleece

As a relatively new spinner with an ahem, already growing fiber stash, I decided to participate in Tour de Fleece this month as a chance to get more comfortable with my spinning skills and maybe work through some of that stash. I joined Team Webs and set myself three goals for the event.

  1. Spin from stash only, no new fiber purchases allowed.
  2. Spin at least one woolen-spun yarn.
  3. Spin at least one 3-ply yarn.

Unfortunately, my eyes were bigger than my stomach! There's only 4 days left and I have yet to finish my first skein. I had only spun thicker singles previously, so I didn't realize how much longer it takes to spin nice, even fine singles. I'm trying not to get discouraged seeing everyone else's massive accomplishments because I am having fun spinning my gorgeous Falkland fiber from Gynx.

So pretty! This is an experimental colorway and I wasn't sure if I would like how it turned out but my fears were for nothing--it's spinning up beautifully and I can't wait to work with it. The plan is to make a 2-ply and hopefully I'll have enough yardage for a September Circle or similar cowl.

I'm halfway into my second bobbin at this point, so it's a race to see if I can finish the second bobbin and ply it by Sunday!